• The project documentation beside drawings from Aqua-Partners ApS will typically include:

1. General description of concept and production system /application in general


2. Production logistics and plans as foreseen. Pilot operation/hatchery operation.


3. The specifications of the facility (biological/chemical) per section.


4. Mechanical dimensions of process components.


5. System description (preliminary/final) – overall


6. System description (final) – (description/section)


7. Equipment list (final) (list/section)


8. List of combined equipment elements – plug and play parts (list/section)


9. Motor list (List/section)


10. Instrument list (List/section)


11. Building specifications.

 

 

  • Drawings: 

1. Overall plan of facility (preliminary/final), with proposed building layout.


2. Layout plan of each of the four sections.  (Drawing/section)


3. Equipment position drawings of all sections. (Drawing/section) 


4. Drawings of concrete structures, which relates to installations within building.


5. Drawing showing elevation of sections.


6. Sections drawings showing vertical position of equipment elements and tanks, and connections between plug and play components. (Drawing/section)


7. Process water pipe indication plan. (Drawing/section)


8. Flow diagram of each section (Drawing/section)


9. Aeration pipe indication plan. (Drawing/section)


10. Oxygen supply pipe indication plan. (Drawing/section) + general. 


11. Electricity installation indication plan. (Drawing/section)


12. Intake pipe indication plan. 


13. Discharge diagram of entire facility. 


14. Position drawing of all piping which are embedded in concrete /floors/walls. 


15. Set of plans to clarify the assembling of plug and play component.